The program

FrontLoaded

Your front squat is not built on squat day.

In progress · not for sale yet
FRONT LOADED, a training program by CJ Fazio

You have felt this one before.

The bar is loaded to a number you have already hit. You brace, you sit into it, and out of the bottom it slows. You grind it, you rack it, you call it a bad day. Then it happens again the week after.

So you change something. More sets, fewer sets, a rep scheme somebody posted. Two good sessions, then the same weight stops you in the same place.

You cannot tell if it is your form, your programming, or you. That doubt is the problem. Not the weight.

What you are actually after

You want it to move again.

Walk in already knowing what is going on the bar, put it up clean, write something heavier down for next week. Then do it again.

And stop wondering. Know it is working while it is working, instead of finding out a year from now that it was not.

Be honest about this

When did it stop moving?

You can probably name it. There was a stretch where the number climbed almost on its own, and then a point where it stopped.

Not through a lack of effort. You have been in there the whole time. The work just stopped turning into anything, and nothing you try seems to change that.

Nothing changes
  • Fifty more sessions decided in the car on the way there
  • This time next year, the same bar and the same plates
  • You still cannot tell whether it is you or the plan

Same year either way. Same effort either way. Only one of them moves the number.

So why has it not moved

The front squat builds you. Something has to build the front squat.

It is the lift that carries into everything else, which is why it is the hardest one to move. It asks your upper back to hold position, your quads to still have something left, your body to have actually recovered. Squat day does not supply any of that. Squat day spends it.

You have been trying to build the front squat on the front squat. That is why nothing you change ever sticks for more than two weeks.

I did it for years. Former Division 1 running back, built for this, rewriting squat day over and over while the six days around it stayed exactly the same. The lift was never the thing that needed rewriting.

What crosses it

The whole week, written down.

If the week decides the lift, the week is what has to be written. Everything around squat day, in the order I run it.

Every training day

Not just the one you were already doing.

Your weak point, on purpose

Where the bar breaks down becomes actual sessions.

Loading off your own numbers

Write them in once. Stop doing maths at the rack.

What to do when life hits

One bad stretch does not end the block.

Before you put your name down

This is not for everybody.

It takes grit, patience, and consistency. If you are looking for a program that promises a number in four weeks, or one you can run twice and quit, this is not it and you will not enjoy it.

If you are still reading, it is for you.

Be first

It opens when it is right.

I am not putting it out half finished to hit a date. Put your name down and you hear the day it opens.

One email when it opens.

While you wait

Go and fix the lift itself.

Every bit of front squat technique is already written and it costs nothing.

Read the free playbook